Introduction to Production Activity Control
Production
activity control is used for executing the master production schedule and the
material requirement plan.
PAC
can be classified to : - planning, implementation, and control production
PLANNING
- -
The flow of work through each of the work that must be
planned to meet lead time
- -
The company also need to have availibity to manufacture the
components when needed
IMPLEMENTATION
Once
the plans are made, the production activity must put them in action by advising
the shop for what must be done :
- - The company need to gather the information to make the product
- -
Then, release order as authorized by the material require
plan
CONTROL
When
the plans are made and the shop order released, the process must be monitored
to learn what is happening. Then, the company must compared to the plan whether
corrective action is necessary :
The
company need to :
- -
Rank the shop
- -
Track the actual performance of work and compared to planned
schedule
- -
Monitor and control the plan
- -
Report